2017.4459

LB_BTR_drawing_2017_013.tif

Title
LB_BTR_drawing_2017_013.tif
Alternate Identifier
BTR2017
Date
2017
Tags
Bending the river

Related Items

BTR2017_OVS_crop_003.tif
2018.771 (BTR2017)
214951982-L-A-State-Historic-Park-Renovation-Renderings.pdf
2014.1063
Untitled25.jpg
2018.487 (BTR)
BTR20190927_Drone_Construction_BTR201909127_Drone_Construction_DJI_0013.JPG
2020.177 (BTR2019)
BTR20191001_Drone_Construction_DJI_0141.JPG
2020.188 (BTR2019)
LB_BTR_drawing_2017_004.tif
2017.4450 (BTR2017)
Untitled16.jpg
2018.518 (BTR)
<em><strong>Bending the River Back Into the City</strong></em>, 2012—ongoing. The treated water will become a community commons. The 32-acre Los Angeles State Historic Park will receive all its water from the regenerated river water as will the Albion Riverside Park. Lauren Bon received the city’s first private water right, # 21432, to enable this distribution network.
2018.826 (BTR2015)
BTR2018_OVS_009_cropped.tif
2018.384 (BTR2018)
BTR2018_039_Hyphae_Ivan Heitman_20180511.tif
2018.101 (BTR2018)
Photo-Joshua_White-jwpictures.com-4764.tif
2017.5947 (BTR)
BTR2018_012_Sacred Geometry-Pit_LB.tif
2018.364 (BTR2018)